"Prufrock Rigging Take Down" Tesla Gigafactory Texas. 6/13/2024 9:06AM

8,379
0
Published 2024-06-13
All the rigging for the conveyor belt has been removed and Prufrock has been taken away. Didn't see it anywhere. Walls are being attached to the west side of the south extension. New lots is being paved on the west side.

Please Like and Subscribe to this channel. Click the bell for notifications.
Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER…

#Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #Construction #DumpTrucks, #Scrapers, #Excavators

All Comments (21)
  • Great musical selection, denoting the half way construction point of GIGA Texas.
  • @terrysmith8655
    Great video Brad, also great timing watching that lifter take out the chunk of concrete from the left most door on the tunnel of the expansion. Today's music was fantastic by the way, I really enjoyed it.
  • @DessieDoolan
    Thanks Brad 0:13. Southend, south. Fire escape passage. Excavation. Screw/auger piles placed. More stacked to the right. Possible pre-fab rebar for the passage extension stacked bottom right. 0:52. Southend, Cooling Tower. Permanent handrail being installed around the top platform. Bottom right. White drainage pipes. 1:05. Southend, east. Below the mezzanine floor. Large diameter pipe laid towards the Cooling Tower. 2:36. Pond. Bottom left. Drain outfall. Black. That don’t look right (again). Fire sprinkler system discharge? 3:33. Stamping, roof. Extending the pipe/cable tray support westward. 4:21. Southend, south. West fire escape passage. Screw pile works. Door opening being cut through the retaining wall. 9:20. Westside, Tunnel Project. Dismantling continues. No sign of the TBM. TBC had some photos on X showing the TBM on a SPMT being transported along River Road west of the highway. Difficult thing to hide, but no sign of it now. Large tent on the westside at 6:07 might just about be large enough. Height of TBM on the SPMT scaled to 19.7’ 6.4m.
  • Thanks Brad! For those hoping to see a second tunnel... Unless I missed something, I didn't see the TBM anywhere. South Expansion: @ 0:13 Screw piles driven outside the fire escape passages. @ 4:22 Excavator with pile driving attachment and screw pile. Puzzled by the need for piles just for fire escapes? Two possibilities.... 1) Very poor soil conditions in the area. 2) The passages are dual purpose. Emergency exit, and some occasional freight. Also @ 4:22 Removing sections of the concrete to open up the wall. Cooling: @ 0:59 5' diameter pipe in trench heading towards the cooling tower. Parking garage: @ 2:19 (Construction road by the pond) The west end of the construction road is closed for construction. Completion of work on the two 8' diameter stormwater pipes. Possibly to bypass the pond or construct a new pond outfall. Rooftop cable trays: @ 3:36 Cable trays are being extended northwest towards the data center. However The two coolant pipes end about where the large water tanks are on the other side of the wall.
  • @perlaursen1885
    Bold move. The soundtracks adds a lot of value to the pictures, so its almost getting artistic. Well done. Per in Denmark 😎🇩🇰
  • Incrível documentário isso sim é trabalhar em prol da humanidade isso não tem preço sem palavras amo e aprecio tudo que faz extraordinário vídeo é essa música show devemos sempre prestigiar nosso milagre promovendo milhares de outros que Deus o proteja sempre sucesso amigo aguardando os próximos
  • @eltonray2934
    0:53 The cooling tower is very similar to the one across the river at the power plant.