XR2-XR5 Piggy Back Ride basic test

Published 2012-04-04
A very basic test of the procedures needed to piggy-back an XR2 Ravenstar inside the XR5 Vanguard.

This was performed live to the recording, no edits. Aside from the fact that the XR2 is just a touch too wide for the vanguard's cargo bay, it's almost a perfect fit. But what it really needs is to piggy-back on TOP of the craft. No worries though. Editing the dock-on configuration should solve for that.

The other thing was how the XR2 was flipped on end by the deployment sequence before being kicked clear by its engines. I think I'll have to figure out how to clear launch that too.

Otherwise, you can see the procedures of setting the autopilots up and syncing them so that the launch looked good.

All Comments (1)