[Poly Bridge 2] I Beat EUNICE on 4-04 with the Optimized Spring Timer!
4,486
Published 2020-06-05
From the previous design, I was finally able to replace all the steels in the Spring Timer with all woods. Furthermore, I update the left bridge, which at first is more expensive, but I'm surprised at how stable it is. Then I optimized that new design, and finally it is cheaper that EUNICE's bridge!
I think this is a proof of concept that you can make a super cheap Spring Timer bridge. Also don't forget that this design is unbreaking!
All Comments (5)
-
Lmao why is this my first video that got 1k views. Thanks for watching! Also, I'm curious if anyone has tried to optimize this design? I heard the left bridge can be replaced with dangling bridge. But I'm bad at dangling bridge. Moreover, the angle of the second car climbing the right bridge is also very important, as it can break the right bridge. Another issue is the distance. Dangling bridge is "longer" than a straight bridge, I'm not sure if the timer will be enough. But if it is enough, then I think that would be the cheapest, glitch-less, unbreaking bridge! So, anyone has enough time to experiment with all of this? :p
-
Nice, beating Eunice deserves a discord role.
-
Ok but how do you do 3999?
-
Could you not wall brace against the left side?