5 tips for Rough-in Phase on New Construction. Electrical wiring.

Published 2023-01-25
We offer the #1 Electrical Exam Prep Program

FREE VERSION
electricalcodecoach.com/free-exam-prep-program

PRO VERSION
www.electricalexamcoach.com/membership-account/mem…

USB OR DVD PROGRAM FREE SHIPPING!!
electricalcodecoach.com/shop/ols/products/usb-driv…

400x Practice Exam PDF Download for only 14.99 electricalcodecoach.com/shop/ols/products/400x-exa…

2017 Tabs with FREE SHIPPING
electricalcodecoach.com/shop/ols/products/2020-nec…

2020 NEC TABS with FREE Shipping
electricalcodecoach.com/shop/ols/products/2020-nec…

2023 NEC TABS with FREE SHIPPING
electricalcodecoach.com/shop/ols/products/2023-nec…

All Comments (21)
  • Yes, please make a second video discussing what one should charge for rough in / trim out
  • @rupe53
    Nice idea on taking pictures. My boss used to do that and always lost track of which job was which. I told him to take a shot of the mailbox # or the outside of the house before going inside. That helped quite a bit. You can also add sticky notes on the wall to identify which room or which direction the shots are. (front bedroom, north, south, etc) Just one per room or in any other confusing situation will do.
  • @MrKen59
    Awesome tips - Thank You 🙏
  • @estevaness
    Nice 👍 I make up switch boxes and receptacles on rough in… in my jurisdiction we have to land grounds and neutrals only for rough in.. I’ll mark the outer sheathing and leave it on the hot conductors until final termination , of course this is all de energized.
  • @chrispate2788
    Coach GREAT idea on making this tips vid 👌, thats why your THA MAN, THANKS 💪
  • I am an east Tenn electrician I do not pull a finish permit or service release permit under my license unless I do the work, and the inspector also knows . That way, you may not finish the house, but you are released from the ownership of liability of someone else's work. Always let the power provider know that you refuse to be liable, and demand that they record who pulls finish/ service release permit. It is a matter of public record, and be of great value to you in case of future problems. document all pertinent info! I also take photos, I have had outlets covered up!! Thats what drywallers do!
  • @knobntube5515
    If you have a choice for rough in, do you prefer to start after all plumbing and hvac? Do you write that into your contracts?
  • I been landing boxes behind the kitchen sink, mounted so front of the is 1.5" or so proud of the framing. Cabinet installer is forced to cut it in...
  • @Avotts
    I need help in repairing doublewide. PLEASE.