OVM Ard Germe (Post Tensioning) Yöntemi Sadr Köprüsü İran

1,063,606
0
Published 2015-11-02

All Comments (21)
  • greatest mystery solved.. I can sleep peacefully tonight.. thanks for such a great explaination.
  • @brianho6625
    Thanks for specialist explaining their specialty for generalist.
  • @mikeomolt4485
    Always read the instructions, you may wish to turn the music off if this is your first attempt at post-tensioning.
  • @Pavan_789
    I am also working as Post Tension designer . The video was really very good in understanding
  • Having used the same system almost 40 years ago except it was a single 19 strand stress at a time and only from one end , the only time we double end stressed the cables was if we did not get the required extension on the cables and then we stressed the other end and went to 10% then straight to either 70% 0r 90% cant quite remember which it was , i find it strange at 4-31 that the video seems to imply that a second "cheese" was applied to the back of the stressing jack , and a second series of collets / wedges , when i seem to remember everything was built into the jack
  • Such a great structure. I had this chance to watch building the bridge.
  • @edws261
    Segmental Girder for highway bridge had been a common method in metropolitan city as Jakarta..
  • @ahamyani1694
    Very good Allah i3awankom Allah ja3tikom Algeer I love iranian Allaho Akbar ..🇱🇧🇱🇧🇰🇼🇰🇼🇰🇼🇰🇼🇰🇼🇰🇼🇰🇼🇰🇼🇰🇼🇳🇱
  • Watch video solutions of engineering questions to expertise your knowledge of engineering!
  • @rxsyete
    What kind of adhesive is used between segments?